Add Petroleum Production, Pertamina drilling four wells

Posted on August 25, 2017 By

To increase oil production, PT Pertamina Hulu Energi is conducting a drilling four wells in West Madura Offshore (WMO). Wells are being intensively explored today are PHE N-1 (Rig Bohai-8) which has been drilled to a depth of 3491 feet.
Operational Director of PT Pertamina Hulu Energi, Eddy Purnomo said in addition to drill exploration wells paa, PHE also is conducting development drilling on wells, the PHE 54A-1 (rig Java Star)
“Today, Java Star up in the depths of 2045 feet,” said Eddy Purnomo at the Ministry of Energy and Mineral Resources, on Tuesday (16/07/2013).
PHE ONWJ also are exploring the development of PHE wells 40A-7R (rig Harvey Ward) drilled at a depth of 3077 feet, and PHE development wells 38B-7 (rig COSL Seeker) reached a depth of 2007 feet.
To note, during the first half of 2013, oil production of Pertamina Hulu Energi West Madura Offshore reached 10,220 barrels per day (bpd), or about 50 percent of which has been targeted at 20 443 bph.
But the number of such production under the same target is not met, the low realization of production in the first six months of this because in the early years of oil production is still below 10,000 bpd.
“Pertamina had experienced problems in mounting platform (platform) and the addition of new drilling rigs,” said Eddy.

Production     , , , ,